phoneicon  541-550-5989 (Phone)
541-550-5987 (Fax)

Quarry

Prices quoted are delivered in the Bend Urban Area in full truck-loads.
-- OR --
You haul from our quarry located on the south end of Cinder Butte Road in Bend's Deschutes River Woods.
MINIMUM SALE $20.00

SOILS 1/4" SCREENED

Premium Soil Blend - Composite 50/50 Mix 24.95 cu yrd
Regular Topsoil - Not Composite 14.95 cu yrd

FILL MATERIALS

1/4" Screened Fill 9.95
#2 Fill Dirt Pit Run 8.00 cu yd

SAND

1/16" - 0" Concrete Sand - Gray Washed 38.95 cu yd
Arena Sand 19.95 cu yd

CRUSHED ROCK - SALMON STONE

3/4" - 1/4" Washed - No Fine Material 37.95 cu yd

CRUSHED ROCK - HARVEST GOLD

3/8" - 0" with Fines 44.95 cu yd
3/4" - 0" with Fines 44.95 cu yd
3/4" - 1/2" No Fine Material 49.95 cu yd
1 1/2" - 3/4" No Fine Material 47.95 cu yd

CLAY FOR PONDS

Bentonite Clay 37.95 cu yd

LARGE & SMALL BOULDERS - MANY VARIOUS KINDS

Brown/Gray Basalt Boulders or Red Lava $37.50/Ton, $375.00/load (10 ton Minimum delivery Bend)

CRUSHED ROCK - GRAY

3/4" - 1/4" Washed - No Fine Material 30.95 cu yd
3/4" - 0" State Spec - 73% Rock 27% Fines 21.95 cu yd
4" - 2" Crushed Drain Rock - No Fine Material 17.95 cu yd

COMMERICAL BASE

3/4" - 0" Commercial Base 50% Dirt, 50% Gravel 13.95 cu yd

RIVER ROCK - ROUND GRAY WASHED CLEAN

3/8" - 1/8" Pea Gravel 37.95 cu yd
1" - 1/2" Marble Size Rock 37.95 cu yd
2 1/2" 1 1/2" River Rock 37.95 cu yd
6" - 3" River Rock 37.95 cu yd

SOIL ADDITIVES

3/4" - 1/4" Pumice Solid Additive 15.00 cu yd

RED LAVA ROCK

Red 1" - 1/2" Decorative 32.95 cu yd
Red 3/4" - 0" Decorative/Driveway 17.95 cu yd
Red 3" - 0" Decorative/Driveway 14.95 cu yd

Prices and availability subject to change without notice.

NOTICE: $25.00 FEE ON ALL RETURNED CHECKS. We load under your supervision. Buyer acknowledges and accepts liability for damage due to material loading/overloading. Seller shall not be liable in tort or contract for special, indirect or consequential damages to Buyer or to third parties. Risk of damage or loss shall be borne by Buyer. Our drivers will make every effort to place materials where customer designates, but company assumes no responsibility for damage inside curb or property line.

PRICING ASSISTANCE

 The following table will assist you in determining how much material you will need to order:
Square feet of area you need to cover ÷ 160 for 2" deep
108 for 3" deep
80 for 4" deep
54 for 6" deep
= Equals cubic yards required
Select Proposal Type
Invalid Input
Please let us know your message.
Please let us know your name.
Invalid Input
Please let us know your email address.
Enter your phone number
Invalid Input
Invalid Input

Latest Projects

  • Sunriver Path Reconstruction

    Sunriver Path Reconstruction

    Customer: City of Sunriver
    Engineer: City of Sunriver
    Description: Walking Path Asphalt Paving & Parking Area
    Project Value: $ 600,000.00
    Status: Completed – June 2011

  • Prineville Facebook Facility Paving

    Prineville Facebook Facility Paving

    Customer: Facebook, Inc
    Engineer: N/A
    Description: Facility Entrance, Parking Area Grading and Asphalt Paving.
    Project Value: Not Available
    Status: Completed June 2011

  • Clients

    • Powell Builders
    • R&H Construction
    • RD Building & Design
    • Reinhart Construction
    • River Meadows HOA
    • Robinson & Owens Heavy Construction
    • Shamrock Construction
    • Sunforest Construction
    • Sunriver Owners Association
    • Sunwest Builders
    • Latham Excavation
    • McKernan Eneterprise
    • Oregon Park & Rec
    • OWWL II POA
    • Pacwest Development
    • Alex Hodge Construction
    • Apollo Inc
    • Bend Park & Rec
    • City of Redmond
    • CS Construction
    • Daimler Trucks
    • Diamond Peaks Summit HOA
    • Dickerhoof Construction
    • Grizzly Mountain Excavation
    • Knife River Central Oregon
    • Timberline Construction
    • Wittmer Construction
    • Wilson Curb Construction
    • York Bros Excavation
    • York Building & Design
    • Pine River Homes